A slab foundation measuring 80 x 4.5 x 1.2 meters for a new printing machine weighing several tons. A foundation was needed that could bear both static and dynamic loads, as the powerful guillotine cut large reams of paper with impact. The ground was marshy, peaty, requiring replacement, and did not guarantee durability. The investment was carried out based on a study by the Institute of Building Construction at Poznań University of Technology.
See also: Concrete roof slab