Filling the load-bearing structures with regular concrete led to excessive settling of the structure. 5400 m² of the parking subbase was filled with PB 600 Foam Concrete, reducing the load by over 3000 tons.
See also: Foam Concrete price

Filling the load-bearing structures with regular concrete led to excessive settling of the structure. 5400 m² of the parking subbase was filled with PB 600 Foam Concrete, reducing the load by over 3000 tons.
See also: Foam Concrete price