Renovation of a multi-story parking structure due to ongoing structural deterioration. The renovation involved replacing the concrete with PB 600 Foam Concrete. The structure’s levels were relieved by about 500 tons. A waterproof membrane was applied over the Foam Concrete, and concrete pavers #6 cm were laid.